Case 03 · Contract packager, Midwest · 2026 · Name withheld

What a $13.3 million line has to earn per hour

A contract packager received a state incentive award for a new automated production line: $13.3 million of capital, expected to create nine jobs. The record shows jobs created, not jobs removed, so the payback cannot come from labor saved. It has to come from what the line produces per scheduled hour. That number is not in the public record. This is it, worked from what is.

$427 to $565
per scheduled hour, on three shifts derived
$1.48M
of capital per job created derived
$1.79M
six-year cost of running 10 percent under the promised rate our estimate

Two facts from the public record

  • cited The state economic-development award record for the project: a building addition and a new automated production line, $13.3 million of capital investment, nine jobs created, six of them incented at a qualifying wage of about $30 an hour, and a state tax credit awarded against the investment. Event date 2026, verified September 2026.
  • cited The plant's own pages: a careers page listing roles on second shift, third shift and nights, and an automation page stating it has installed several automated lines in the past few years. Both verified September 2026.

We do not name the company, its town or the agency; the figures come from the public award record and the company's own pages.

What the line has to generate, with every input labeled

The ledger is the analysis. Cited figures come from the public record and stay fixed; every estimate is a slider, and the totals re-run as you move them, so the plant's real hurdle rate, burden and shift plan replace ours in one motion.

LineValue
Capital investment citedStated in the award record.
$13,300,000
Net capital at risk derivedThe award less its credit, exact. Generous to the project: the credit is performance-based, earned as qualifying assets are placed in service and spread over five years, so none of it offsets day one. The record does not split the building from the line, so the whole award is charged to the line here; the line-only figure is lower our estimate.
$12,956,503
Capital per job created derived$13.3 million divided by nine jobs created.
$1.48Mper job created
Capital recovery window our estimateSimple payback. The plant's own hurdle rate replaces this on the slider.
6 years
Capital recovery per year derivedNet capital spread across the window.
$2,159,417per year
Incented wage, nine new jobs citedSix of the nine are confirmed at that wage in the record.
about $30per hour
Wages per job per year our estimateThe wage is cited; 2,080 annual hours is ours.
about $63,000
Burden multiplier our estimate1.25 to 1.40, a little below the 1.43 the federal employer-cost average implies, because incentive-qualifying wages usually carry the leaner end of benefits. The plant's real burden decides it.
1.30
Added labor, nine jobs fully burdened our estimateNine jobs at the wage above, times the burden multiplier.
$740,060per year
Total the new line must generate derivedCapital recovery plus added labor, in new contribution: revenue less materials and variable conversion cost, before the nine new operators, so the added labor is not counted twice.
$2,899,477per year
Scheduled hours per year our estimate6,000 is three shifts across 250 operating days. The careers page lists second shift, third shift and nights, so that is the likelier line.
6,000
Per scheduled hour derivedThe total divided by scheduled hours.
$483per production hour

Those are our assumptions where the record stops. Send your hurdle rate, burden and shift plan and we send back the version with your numbers in it: hass@hharesearch.org.

The record shows jobs created, not jobs removed, so the payback has to come from rate

Most automation cases close on labor: the cell replaces people, and the saved wages pay for the capital. This one runs the other way. The award record adds nine people to the plant at the same time as the line, and the record shows jobs created, not jobs removed, so the payback cannot come from labor saved. That is an inference from what the record reports, not a statement the record makes. On that reading the labor column is a cost on both sides of the ledger and the whole payback has to be found in what the line produces. Between about $430 an hour on three shifts and about $850 on two, for every hour the line is scheduled, held for five to seven years, and the shifts its own postings describe put it at the bottom of that range.

What a 10 percent rate shortfall costs

At the midpoint of that range, about $2.98 million a year, every single percentage point the line runs below its promised rate is worth about $29,800 a year. Ten percent below is about $298,000 a year, and about $1.79 million across six years, which is roughly 14 percent of the net capital at risk our estimate. Ten percent is not a disaster scenario. It is the ordinary distance between a rate that was quoted and a rate that gets delivered, and the quote is the seller's number: integrators bundle their own simulation into the sale. That work is competent, and it belongs to the party being paid. What does not exist anywhere in that transaction is a rate checked by someone who is not selling the cell our research.

The gap is measurable before the money is spent and verifiable after. In the published record, a simulation of a robotic tray-loading cell in food manufacturing predicted 4,110 packs and the installed line then delivered 4,110, at a 31.2 percent throughput gain; the same study's second case predicted 726 and delivered 723 cited. That is their work, not ours, and the second case is the more useful of the two, because it shows the method reporting its own small miss instead of rounding to a match. A plant that already has several automated lines in the ground has that many predicted rates and delivered rates that could be set side by side, and one more arriving.

What the plant receives

If they write, what goes back is a two-page note: the ledger above, every assumption stated so their team can swap in their real shift plan, case and pallet pattern, and the rate their integrator has quoted, plus what the line has to hold for the capital to close. Our standard is the one in the published record: the number is predicted before the plant spends and measured after. The full predicted-then-measured study is a paid engagement with a fixed scope; the note is not it. Replying carries no obligation.

What is cited, and what is ours

  1. The state economic-development award record for the project, event date 2026, verified September 2026. Supports the capital investment, the credit, the jobs created and the incented wage. Withheld.
  2. The award program's own rules on how the investment credit is earned and spread, verified September 2026. Supports the note that none of the credit offsets day one. Withheld.
  3. The plant's own careers page (shift structure) and automation page (several automated lines already installed), both verified September 2026. Withheld.
  4. Simulation study of a robotic tray-loading cell in food manufacturing, Foods 2024, 13(19):3121, published September 2024. Case A predicted 4,110 and delivered 4,110 at a 31.2 percent gain; case B predicted 726 and delivered 723, read from the full text. Their work, not ours.
  5. Burdened-labor multipliers and the competitive picture behind the unchecked-rate finding: HHA research, August 2026. Sources itemized on request.
Scope. This analysis is built from the plant's published record as part of HHA's research program on verified prediction in production automation. It is industry analysis applied to published facts, not engineering advice about any plant, and not a substitute for the plant's own evaluation. Equipment decisions remain the plant's.

Buying a line for rate?

Send what the line is meant to run. We reply with what it has to earn per scheduled hour for the capital to close, what a 10 percent miss costs, and whether it is worth thirty minutes on a call. We reply within two business days.

Write to
What you get back
Two pages: the number the decision turns on, with every assumption labeled. Replying carries no obligation.
Previous case
All cases
The analyses on this site are the work of the HHA team: Haedar Hadi, Lead Principal Investigator; Hass Dhia, Co-Principal Investigator and Treasurer; Ahmed Dhia, Director of Manufacturing. Hass answers this address.
Anything a plant sends stays private. We publish nothing about a plant that engages us.